How to price a rewire: a three-bed house, worked through end to end
How to price a full house rewire: the survey, first fix, consumer unit, second fix, testing, making good, overhead and markup. One three-bed job in full.
Free guide · Updated November 2026
A rewire is priced the same way as any job: agree the points, put days against each stage, cost your labour, materials and the plasterer, add the costs people forget, recover your overheads for the days on site, then put your markup on the bare cost. What makes a rewire different is that the house is usually lived in, most of the work is under floors and inside walls, and the job ends with certificates. Price the making good as carefully as the cable, and say on the quote who plasters and who decorates.
This page sits under our guide to pricing a job. It walks one full rewire of an occupied three-bed house from the survey to the figure on the quote, as our guides to pricing a bathroom and pricing an extension do for those jobs. The other worked examples are a kitchen fit, a re-roof, a decorating job and a patio. The numbers are an illustration built from one set of costs, not a market rate: use your own.
Part 1Start at the survey
Most of the money lost on a rewire is lost on the first visit, by counting sockets and not looking at the house:
- Read the condition report, or inspect it yourself. An Electrical Installation Condition Report, if there is one, tells you what you are taking out. Look at the earthing, the main bonding and the supply head. Anything that needs the network operator is outside your price, and the quote should say so.
- Agree the points room by room. Sockets, lights, switches, cooker, shower, outside lights, data. Put the list on the quote, because a rewire grows one socket at a time.
- Look at the floors. Boards lift. Chipboard under a fitted kitchen is another matter, and a solid ground floor means chasing or trunking.
- Look at the walls and ceilings. Old lath and plaster can come away in sheets. HSE says asbestos can be present in any building built or refurbished before 2000, and its list for houses includes textured coatings such as Artex and board behind the fuse box. If you suspect it, have it tested before you chase or drill.
- Ask how the house will be lived in. Which rooms can be cleared and when, and whether the family needs lights and a working fridge every night. That decides the order of the job, and the order decides the days.
Anything you cannot see until the boards are up goes on the quote as a provisional sum, not as a guess folded into the price.
Part 2Break it into stages and days
A full rewire of a three-bed house, by you and an electrician's mate:
- First fix: rooms protected one at a time, boards up, walls chased, joists drilled, new cables run, old circuits made dead.
- Consumer unit: the old board out, the new one in, the power back on before you leave.
- Second fix: accessories and fittings connected, boards relaid and screwed down.
- Testing and certification: the full inspection and test, and the certificate written up.
- Making good: chases filled, then the plasterer in behind you.
On the example job below that is 5 days of first fix, 1 for the consumer unit, 2 of second fix and 1 of testing: 9 days on site for you, and 7 for your mate on the first and second fix. In an occupied house, allow for making everything safe and working at the end of each day. That half hour is the part people leave out.
Part 3Notification and certificates
In England a rewire is notifiable work under Part P of the Building Regulations, because it means new circuits and a new consumer unit. If you are registered with a competent person scheme you self-certify: you complete a BS 7671 Electrical Installation Certificate and give it to the person who ordered the work, and within 30 days you or your scheme give the occupier a Building Regulations compliance certificate and tell building control. If you are not registered, building control must be notified before the work starts, or a registered third-party certifier appointed before work begins.
Wales has its own Approved Document P, which also lists new circuits and consumer unit replacements as notifiable, with the same choice between a registered installer and building control. Scotland and Northern Ireland run their own systems, so check with the local building standards or building control office there.
For the price, the testing day is in the days above. A building control charge, or a scheme fee for registering the job, is a cost line of its own.
Part 4Materials, and who carries the risk
Price the cable and the consumer unit from a merchant's quote, not from memory. Cable prices move, so say on the quote how long it is valid for. Price a standard range of accessories, and put a PC sum in for any finish or fittings the customer has not chosen. If they buy their own fittings, say that you fit what is supplied.
Part 5Plastering and decorating: say who does what
The argument most likely at the end of a rewire is about the walls. Decide it before you quote, and write it down:
- You fill chases and make good round boxes to a stated standard, for example ready for the plasterer.
- A plasterer, subcontracted by you, patches the chases and ceiling openings, priced in writing to a scope that matches yours.
- The customer decorates and lifts the carpets, unless you are pricing them. A rewired house almost always needs redecorating, and a customer nobody told will remember it as damage.
Part 6The costs people forget
The hidden costs of a job on a rewire mostly come from working in somebody's home: floor protection, parking every day, taking away the old cable and board, and the bits and blades old plaster gets through. Each is its own line, so your markup applies to the full cost.
Part 7The worked example
Here is the job above priced in full. Your labour is costed at the wage you pay yourself, £250 a day, and your mate at £150 a day including employer costs, as a separate line. Your overheads are recovered separately, at £55 for each day on site (our guide to working out your day rate shows where those figures come from), and the markup is 20% of the bare cost.
| Your labour, 9 days at £250 | £2,250.00 |
|---|---|
| Electrician's mate, 7 days at £150 (wage plus employer costs) | £1,050.00 |
| Consumer unit and protective devices | £480.00 |
| Cable, back boxes, accessories and fixings | £1,350.00 |
| Plasterer, making good chases and ceilings, subcontracted | £750.00 |
| Provisional sum: replacement floorboards, if needed | £150.00 |
| Dust sheets and floor protection | £85.00 |
| Parking, 9 days at £8 | £72.00 |
| Disposal of the old cable and board | £60.00 |
| Consumables: clips, grommets, bits, blades | £90.00 |
| Bare cost of the job | £6,337.00 |
| Overhead recovery, 9 days at £55 | £495.00 |
| Markup at 20% of the bare cost | £1,267.40 |
| Price before VAT | £8,099.40 |
Two things about how that reaches the customer. The overhead is never a line on the quote: it is spread through the line prices, so the customer sees the work, not your van insurance. And the markup is a markup on cost, not a margin: £1,267.40 on an £8,099.40 price is a margin of about 16%. Our guide to markup vs margin explains why the difference matters.
If you are VAT registered, VAT goes on top, and a quote to a homeowner shows the total including it: here £8,099.40 plus £1,619.88 VAT at 20%, or £9,719.28.
Part 8Put it on a quote that holds
A rewire suits stage payments: a deposit on acceptance that covers the consumer unit and cable, a stage when first fix is done, and the balance on completion and testing. Our guide to what to put in a quote covers the rest; on a rewire three things matter most: the agreed list of points, the provisional sums for what is under the floor, and the exclusions, such as decorating, carpets and any work by the network operator. When the customer asks for four more sockets halfway through, that is a variation: price it and agree it before you fit them.
Common questionsPricing a rewire: quick FAQ
How do I price a rewire?
Survey the house and agree the points room by room. Put days against first fix, the consumer unit, second fix and testing, cost your labour, materials and the plasterer, add the forgotten costs, recover your overheads for the days on site, then add your markup to the bare cost.
How long does a full house rewire take?
It depends on the house, whether people are living in it and whether you have a mate. The example above is 9 days on site. Price your own days, from your own pace.
Does a rewire need building regulations approval?
In England and Wales it is notifiable work under Part P. A registered competent person self-certifies it; otherwise building control is notified before work starts (in England, a registered third-party certifier is another route). Scotland and Northern Ireland have their own systems, so check locally.
Who does the plastering and decorating after a rewire?
Whoever the quote says. Write down who fills the chases, who plasters them, and that decorating is excluded unless you are pricing it.
What certificates does the customer get?
From a registered installer, a BS 7671 Electrical Installation Certificate, and a Building Regulations compliance certificate within 30 days of the work being finished. If building control handled the job, they issue a certificate once satisfied that it complies.
Price it once, properly
TradeDraft prices the job the way this page does: your labour, materials and subcontractors as lines, your overheads recovered for the days the job takes and spread through the prices, and your markup on the bare cost, with the margin shown before you send. Free for 30 days, no card needed. After that it's £45/month or £450/year, cancel anytime. Start by 5 April 2027 and it’s £22.50/month for your first 12 months. See TradeDraft's quoting software for electricians.
Price a job freeWant to keep this? Get our four core guides (VAT & CIS, Pricing a Job, Getting Paid, CIS for Subcontractors) as print-ready PDFs, plus a one-page job-pricing checklist — free.
We use your email to send you the toolkit, and to send updates only if you tick the box. See our Privacy Policy.
More free guides
This guide is general information for UK tradespeople, current to the best of our knowledge in 2026, and is not tax, accounting or legal advice. Rates, thresholds and how they apply to you change, so confirm your position with HMRC, a qualified accountant or a solicitor before relying on it. TradeDraft accepts no liability for decisions made on the basis of this guide. Questions: hello@tradedraft.co.uk.