How to price a decorating job, worked through on a three-bed house
How to price a painting and decorating job: prep, mist coats, woodwork, drying time, materials, overhead and markup, with a three-bed house worked in full.
Free guide · Updated November 2026
Price a decorating job from the days it takes, not from the size of the rooms: work out how long the prep and each coat will take, including the drying time you cannot work through, cost your labour and materials, add the costs people forget, recover your overheads for the days on site, then put your markup on the bare cost. On most interiors the prep is most of the job, so that is where the days go, and where a price is usually lost.
This page sits under our guide to pricing a job. It walks one interior through, a three-bed house with walls, ceilings and woodwork, from the survey to the figure on the quote. There are worked examples for other jobs too: a bathroom refit, a kitchen fit, a rewire, a re-roof, a patio and a extension. The numbers are an illustration built from one set of costs, not a market rate: use your own.
Part 1Look properly before you price
A decorating survey is mostly about the surfaces under the colour. Walk every room and check:
- The walls and ceilings. Cracks, blown plaster and old repairs all mean filling and sanding, and a badly cracked ceiling can double the prep in that room.
- Wallpaper to come off. Lift a corner. Paper painted over several times, or hung straight onto unsealed plaster, comes off slowly and can take the plaster face with it.
- New plaster. Ask when it was done. It has to dry before it takes a mist coat, and a room that is not ready on the day you planned is a day you lose.
- The woodwork. Count the doors, frames, skirtings and spindles. Woodwork is slow, and the count is easy to get wrong from memory.
- The age of the paint. HSE's guidance on lead says you are most at risk if you regularly remove paint in properties built before the 1980s, especially by dry sanding or stripping with a blow lamp or gas torch. It advises stripping old paint only where it is flaking, chipping, giving off dust or a risk to children. If old woodwork must be stripped, the method changes your days and materials, so decide it now. HSE covers Great Britain; in Northern Ireland the regulator is HSENI.
- What is in the rooms. Furniture, carpets staying down, a family living there. Working around people is slower than working in empty rooms.
Anything you cannot judge on the survey, such as how much plaster comes away with the paper, goes on the quote as a provisional sum rather than a guess folded into the price.
Part 2Break it into stages and days
Put time against each stage, in the order you will do them:
- Protection and moving: furniture to the middle of the room and sheeted, floors and stairs covered, fittings masked.
- Stripping: wallpaper off, walls washed down.
- Preparation: filling, sanding, caulking, spot-priming. This is the biggest stage on most interiors.
- Mist coat: a thinned first coat on any new plaster, mixed to the paint maker's instructions.
- Ceilings and walls: usually two full coats, more for a big change of colour.
- Woodwork: undercoat and top coat on doors, frames and skirtings.
- Snagging and clearing up: touch-ups, furniture back, a clean finish.
Drying time is what turns hours into days. Every coat has to dry before the next goes on, and in a cold or damp house that takes longer than the tin says. You can work one room while another dries, but on a small job you will sometimes simply be waiting.
On the example job below that comes to 12 days on site: you for all twelve, and a second decorator for eight of them while the stripping, prep and walls are at their heaviest. The days are the number that matters most, because your labour and your overhead recovery both follow from them.
Part 3Per room, by the area, or by the day
Customers often ask for a price per room, and some decorators work from a rate per square metre. Either can produce a fair price, but your wages and your overheads run by the day, whatever the size of the room, and a small bedroom with a cracked ceiling and two doors can take longer than a large plain lounge.
So count the days room by room. If the customer wants a price per room, split your total by room from those days. A rate per square metre is a useful check, as long as it is your own rate, from your own jobs.
Part 4Materials, and who carries the risk
List the materials you will actually buy: paint for each coat, filler, caulk, abrasives, tape and masking film. Name the paint and the finish on the quote, so a later request for a dearer range is priced as a change, not argued about.
If the customer is still choosing wallpaper, put a PC sum in for it. If they supply the paper or paint, say so, and say that you hang or apply what is supplied. A pattern repeat that needs more rolls than they bought costs you time, and the quote is where that is agreed in advance.
Walls that need skimming rather than filling are a plasterer's job. Get their price in writing, put it on as a line, and allow for the plaster drying before you start.
Part 5The costs people forget
The hidden costs of a job on decorating are small, so they get left out: dust sheets that wear out, parking, the run to the merchant for another tin, taking away stripped paper, and the return visit after the carpet fitter. Each is its own line, costed like the work, so your markup applies to the full cost.
Part 6The worked example
Here is the job above priced in full. Labour is costed at the wage you pay yourself, £250 a day, and the second decorator at £160 a day including employer costs; your overheads are recovered separately, at £55 for each day on site (our guide to working out your day rate shows where both figures come from); and the markup is 20% of the bare cost.
| Your labour, 12 days at £250 | £3,000.00 |
|---|---|
| Second decorator, 8 days at £160 (wage plus employer costs) | £1,280.00 |
| Paint: mist coat, emulsion, undercoat and top coat | £820.00 |
| Prep materials: filler, caulk, abrasives, tape and masking film | £180.00 |
| PC sum: wallpaper for the main bedroom feature wall | £150.00 |
| Dust sheets and floor protection | £90.00 |
| Waste: stripped paper and empties taken away | £60.00 |
| Parking, 12 days at £6 | £72.00 |
| Merchant runs, van and time | £50.00 |
| Bare cost of the job | £5,702.00 |
| Overhead recovery, 12 days at £55 | £660.00 |
| Markup at 20% of the bare cost | £1,140.40 |
| Price before VAT | £7,502.40 |
Two things about how that reaches the customer. The overhead is never a line on the quote: it is spread through the line prices, so the customer sees the work, not your van insurance. And the markup is a markup on cost, not a margin: £1,140.40 on a £7,502.40 price is a margin of about 15%. Our guide to markup vs margin explains why the difference matters.
If you are VAT registered, VAT goes on top, and a quote to a homeowner shows the total including it: here £7,502.40 plus £1,500.48 VAT at 20%, or £9,002.88.
Part 7Put it on a quote that holds
Most arguments on a decorating job are about scope, so write it down: which rooms, which surfaces, how many coats, whether radiators, cupboards and the stairs are in, and who clears the rooms. Our guide to what to put in a quote has the full list.
Put the wallpaper in as a PC sum and any doubtful plaster as a provisional sum. Take a deposit that covers the materials, and on a job of two weeks or more, set stage payments at the end of each floor or week. When the customer sees the first coat and wants a different colour, that is a variation: agree the extra coats and the price before you put them on.
Common questionsPricing a decorating job: quick FAQ
How do I price a painting and decorating job?
Survey every room, then count the days for each stage: protection, stripping, prep, mist coat, ceilings and walls, woodwork and clearing up. Cost your labour and materials, add the costs that are easy to forget such as protection, parking and waste, recover your overheads for the days on site, then add your markup to the bare cost.
How much should I charge to paint a room?
There is no single right figure, because the prep varies so much between rooms. Work out the days that room will take, cost them at your wage, add the paint and materials, recover your overhead for those days, then put your markup on the bare cost.
Should I price decorating by the day or by the square metre?
Either can be how you present the price, but count the days underneath it. Your labour and overheads are paid by the day, and two rooms of the same size can take very different times.
How many coats should a decorating quote include?
Say it on the quote, room by room. New plaster needs a mist coat first, and a strong change of colour can need a third coat. Once the coats are written down, an extra one is a priced change, not a favour.
What if the customer changes the colour halfway through?
Treat it as a variation. Agree in writing what the new colour adds in coats, days and paint before you put it on.
Price it once, properly
TradeDraft prices the job the way this page does: your labour, materials and subcontractors as lines, your overheads recovered for the days the job takes and spread through the prices, and your markup on the bare cost, with the margin shown before you send. Free for 30 days, no card needed. After that it's £45/month or £450/year, cancel anytime. Start by 5 April 2027 and it’s £22.50/month for your first 12 months. See TradeDraft's quoting software for decorators.
Price a job freeWant to keep this? Get our four core guides (VAT & CIS, Pricing a Job, Getting Paid, CIS for Subcontractors) as print-ready PDFs, plus a one-page job-pricing checklist — free.
We use your email to send you the toolkit, and to send updates only if you tick the box. See our Privacy Policy.
More free guides
This guide is general information for UK tradespeople, current to the best of our knowledge in 2026, and is not tax, accounting or legal advice. Rates, thresholds and how they apply to you change, so confirm your position with HMRC, a qualified accountant or a solicitor before relying on it. TradeDraft accepts no liability for decisions made on the basis of this guide. Questions: hello@tradedraft.co.uk.