Example TradeDraft documents, exactly as your customer receives them.
Real documents, made by TradeDraft from the sample jobs we test it on. Each one is longer than a single A4 page: open any of them to read every page at full size.
Private client · VAT at 20%, staged payments
Where the job starts: Mrs Pemberton's bathroom refit, quoted to a private client. VAT charged at the standard rate, the work broken into priced lines, and the payments set out as a schedule rather than left to be argued about later. This is the job the Variation, Final account and Invoice tabs carry on.

- Address
- 12 Saltery Row, Wendlemouth, BH18 8CB
- Address
- Unit 4, Fenwold Trade Park, Kestlebury BH15 1CX
- Phone
- 01632 960 118
- office@normancobuilders.example
- VAT no.
- GB 274 1592 08
| Schedule of Works | Amount |
|---|---|
| 1.Strip out existing suite, protect the landing and stairs, remove and tip all waste | £850.00 |
| 2.First fix plumbing and electrics: reroute supplies, new spur, extractor and lighting | £1,300.00 |
| 3.Board and tank the wet areas, make good ceiling and window reveals | £1,100.00 |
| 4.Wall tiling and vinyl flooring, labour and adhesives | £1,700.00 |
| 5.Supply and fit sanitaryware, shower valve and glass screen | £1,500.00 |
| 6.Second fix, decoration, seal, snagging and final clean | £750.00 |
| Net total | £7,200.00 |
| VAT @ 20% | £1,440.00 |
| Contract Sum | £8,640.00 |
| Payment | When it becomes due | Amount (inc. VAT) |
|---|---|---|
| Deposit — 25% | On acceptance | £2,160.00 |
| Stage payment 1 | On first fix | £3,024.00 |
| Final balance | On completion | £3,456.00 |
| Account name | Norman & Co. Builders |
| Sort code | 00-00-00 |
| Account number | 00000000 |
- If you accept this quotation within 30 days of the date of issue, the price is fixed. After that it lapses, and we will re-quote before any new price applies.
- The price covers only the works and materials described above. Any additional or changed work will be quoted and agreed with you as a variation before it is carried out.
- Where shown, VAT has been applied in line with current HMRC rules.
- Payment is due by the dates set out in the Payment Terms above; the deposit secures your booking and start date. If you cancel within your 14 days we return your deposit in full — unless you asked us to start early, in which case we keep a share for the work already done, in proportion to the price of the whole job, and return the rest.
- Work will be carried out with reasonable care and skill, meeting your rights under the Consumer Rights Act 2015. Materials we supply will be of satisfactory quality, fit for purpose and as described.
- If we uncover something that could not reasonably have been seen when we quoted, such as rot, a hidden leak or unsafe wiring, we stop, tell you what we have found, and price the extra work for your approval before going on. If you do not agree the extra work, we make the area safe, agree with you how the job is finished or ended, and charge only for work already done and agreed.
- We do not disturb material we suspect contains asbestos. If we find any we stop, tell you, and price any testing or removal for your agreement first.
- Planning permission, listed building consent, party wall agreements and freeholder approval are not included. If any are needed we will tell you and agree who arranges them before work starts.
- Please give us safe access to the working areas for the agreed hours, along with water, power and somewhere reasonable to store materials.
- If severe weather, a supplier failure we could not reasonably avoid, utility works or serious illness delays the works, we tell you promptly, do what we reasonably can to limit the delay, and agree new dates with you. If the delay runs more than 14 days past the agreed date, you may cancel the work not yet done and we refund what you have paid for it.
- When the works are finished we walk round the job with you and agree a written list of anything that needs putting right. That walk-round is Practical Completion: the works are treated as complete from that date, and any defects period runs from it. Agreeing the list does not mean you accept the work as free of faults: your legal rights stay in place for anything found later.
- You have 14 days from the day you accept this quotation to cancel, without giving a reason. To cancel, tell us before those 14 days are up. Any clear statement is enough: a phone call, an email, or a letter to the address on this quotation.
- If you ask us in writing to start work inside those 14 days and then cancel, you pay for the work done up to that point, in proportion to the price of the whole job.
- The 14 days do not apply to a new build, or to urgent repairs or maintenance you asked us to come out for. If on that visit we agree further work, or supply goods beyond the parts the repair needs, you can still cancel that part. Where you asked us to start early, the right to cancel ends once the work is finished.
If you change your mind you have 14 days to cancel, as set out in the terms above. You can use the form below, but you do not have to — any clear statement that you wish to cancel is enough.
Model cancellation form
(Complete and return this form only if you wish to withdraw from the contract)
To Norman & Co. Builders, Unit 4, Fenwold Trade Park, Kestlebury BH15 1CX, office@normancobuilders.example:
I/We [*] hereby give notice that I/We [*] cancel my/our [*] contract of sale of the following goods [*]/for the supply of the following service [*],
Ordered on [*]/received on [*],
Name of consumer(s),
Address of consumer(s),
Signature of consumer(s) (only if this form is notified on paper),
Date
[*] Delete as appropriate
You have 14 days to cancel, as set out in the terms. You do not have to give that up — but if you would like us to begin before those 14 days are over, please tick and sign here.
☐ I want work to start before my 14-day cancellation period is over. If I cancel once it has begun, I will pay for the work already done. Once the job is finished, I can no longer cancel.
This quotation may be accepted by any of the following, whichever happens first:
- Accepting online using the secure link we send, quoting ref TD-2094;
- Paying the deposit or any amount shown towards the works;
- Confirming acceptance in writing by email to office@normancobuilders.example;
- Signing and returning a copy of this quotation.
The whole quotation, scaled to fit your screen. Tap it to read it full size.
Subcontract · CIS and the domestic reverse charge
The hardest one to get right. No VAT is collected because the reverse charge applies, so the customer accounts for it to HMRC and the document says so in words. CIS is deducted at 20%, and not on the materials: what they cost is left out, which is the HMRC rule and the part that is usually missed. Here that is £1,800, their cost, not the £2,448 they are priced at. The UTR is on the document because a contractor needs it to verify the deduction.

- Address
- Corrow House, Tollbridge Lane, Kestlebury BH17 7CA
- VAT no.
- GB 418 2276 51
- Address
- Unit 4, Fenwold Trade Park, Kestlebury BH15 1CX
- Phone
- 01632 960 118
- office@normancobuilders.example
- VAT no.
- GB 274 1592 08
| Schedule of Works | Amount |
|---|---|
| 1.Second-fix carpentry, per unit 6 Unit | £3,672.00 |
| 2.Ironmongery, doors and architrave | £2,448.00 |
| Net total | £6,120.00 |
| VAT — reverse charge | — |
| VAT for you to account for to HMRC | £1,224.00 |
| Contract Sum | £6,120.00 |
| Less CIS at 20%, direct costs excluded | −£864.00 |
| costs excluded from CIS at direct cost (materials, hire, fuel) | £1,800.00 |
| Amount payable | £5,256.00 |
| Payment | When it becomes due | Amount |
|---|---|---|
| Stage payment 1 | On first fix | £2,400.00 |
| Final balance | On completion | £2,856.00 |
| Account name | Norman & Co. Builders |
| Sort code | 00-00-00 |
| Account number | 00000000 |
- This quotation is valid for 30 days from the date of issue. After this date, prices may be revised.
- The price covers only the works and materials described above. Any additional or changed work will be quoted and agreed as a variation before it is carried out.
- Where shown, VAT, CIS and any reverse-charge treatment have been applied in line with current HMRC rules.
- Invoices are payable by the dates set out in the Payment Terms above. Interest and reasonable recovery costs may be charged on overdue amounts under the Late Payment of Commercial Debts (Interest) Act 1998.
- Work will be carried out with reasonable skill and care and, where applicable, in line with the Construction (Design and Management) Regulations 2015.
- If we uncover something that could not reasonably have been seen when we quoted, such as rot, a hidden leak or unsafe wiring, we stop, tell you what we have found, and price the extra work for your approval before going on.
- We do not disturb material we suspect contains asbestos. If we find any we stop, tell you, and price any testing or removal for your agreement first.
- Planning permission, listed building consent, party wall agreements and freeholder approval are not included. If any are needed we will tell you and agree who arranges them before work starts.
- Please give us safe access to the working areas for the agreed hours, along with water, power and somewhere reasonable to store materials.
- If severe weather, a supply failure, utility works or serious illness delays the works, we tell you promptly and agree new dates with you. Neither of us treats a delay of that kind as a breach of contract.
- When the works are finished we walk round the job with you and agree a written list of anything that needs putting right. That walk-round is Practical Completion: the works are treated as complete from that date, and any defects period runs from it.
This quotation may be accepted by any of the following, whichever happens first:
- Accepting online using the secure link we send, quoting ref TD-2101;
- Paying the deposit or any amount shown towards the works;
- Confirming acceptance in writing by email to office@normancobuilders.example;
- Signing and returning a copy of this quotation.
The whole quotation, scaled to fit your screen. Tap it to read it full size.
Business client · VAT split line by line
Quoting another business rather than a householder. Every line carries its net, its VAT and its gross, because someone in their accounts team is going to key these into their own books and wants the split in front of them. The VAT on each line is worked out from the total, not line by line, so the three columns add up to the three figures in the ledger exactly.

- Address
- The Old Maltings, Corrow Street, Kestlebury BH15 1VX
- VAT no.
- GB 552 8104 33
- Address
- Unit 4, Fenwold Trade Park, Kestlebury BH15 1CX
- Phone
- 01632 960 118
- office@normancobuilders.example
- VAT no.
- GB 274 1592 08
| Schedule of Works | Net | VAT 20% | Gross |
|---|---|---|---|
| 1.Strip out existing partitions and floor coverings | £2,400.00 | £480.00 | £2,880.00 |
| 2.New stud partitions, doors and ironmongery | £3,900.00 | £780.00 | £4,680.00 |
| 3.Making good, skim and full redecoration | £1,850.00 | £370.00 | £2,220.00 |
| 4.Contract carpet tiles, supplied and laid 210 m2 | £2,940.00 | £588.00 | £3,528.00 |
| Net total | £11,090.00 | ||
| VAT @ 20% | £2,218.00 | ||
| Contract Sum | £13,308.00 | ||
| Payment | When it becomes due | Amount (inc. VAT) |
|---|---|---|
| Deposit — 25% | On acceptance | £3,327.00 |
| Stage payment 1 | On completion of the first floor | £3,480.00 |
| Final balance | On completion | £6,501.00 |
| Account name | Norman & Co. Builders |
| Sort code | 00-00-00 |
| Account number | 00000000 |
- This quotation is valid for 30 days from the date of issue. After this date, prices may be revised.
- The price covers only the works and materials described above. Any additional or changed work will be quoted and agreed as a variation before it is carried out.
- Where shown, VAT, CIS and any reverse-charge treatment have been applied in line with current HMRC rules.
- Invoices are payable by the dates set out in the Payment Terms above. Interest and reasonable recovery costs may be charged on overdue amounts under the Late Payment of Commercial Debts (Interest) Act 1998.
- Work will be carried out with reasonable skill and care and, where applicable, in line with the Construction (Design and Management) Regulations 2015.
- If we uncover something that could not reasonably have been seen when we quoted, such as rot, a hidden leak or unsafe wiring, we stop, tell you what we have found, and price the extra work for your approval before going on.
- We do not disturb material we suspect contains asbestos. If we find any we stop, tell you, and price any testing or removal for your agreement first.
- Planning permission, listed building consent, party wall agreements and freeholder approval are not included. If any are needed we will tell you and agree who arranges them before work starts.
- Please give us safe access to the working areas for the agreed hours, along with water, power and somewhere reasonable to store materials.
- If severe weather, a supply failure, utility works or serious illness delays the works, we tell you promptly and agree new dates with you. Neither of us treats a delay of that kind as a breach of contract.
- When the works are finished we walk round the job with you and agree a written list of anything that needs putting right. That walk-round is Practical Completion: the works are treated as complete from that date, and any defects period runs from it.
This quotation may be accepted by any of the following, whichever happens first:
- Accepting online using the secure link we send, quoting ref TD-2108;
- Paying the deposit or any amount shown towards the works;
- Confirming acceptance in writing by email to office@normancobuilders.example;
- Signing and returning a copy of this quotation.
The whole quotation, scaled to fit your screen. Tap it to read it full size.
Variation · a change to the job, priced before it happens
"Can you just…" is where most of the money goes missing on a job, because it is agreed in a doorway and remembered differently later. Back on Mrs Pemberton's bathroom, the floor came up and two joist ends were rotten. The extra work gets its own numbered sheet, priced, referenced back to the original quotation, and signed before anyone starts — and every other term of the original agreement carries on unchanged. This is also the sheet that shows the numbered exclusions and the "This price assumes" clauses that any quotation here can carry.

- Address
- 12 Saltery Row, Wendlemouth, BH18 8CB
- Address
- Unit 4, Fenwold Trade Park, Kestlebury BH15 1CX
- Phone
- 01632 960 118
- office@normancobuilders.example
- VAT no.
- GB 274 1592 08
| Schedule of Works | Amount |
|---|---|
| 1.Cut out and replace rotten floor joist ends, treat and re-support, per joist ×2 | £480.00 |
| 2.Lift and relay the floor deck over the repaired area, new WBP ply and fixings | £520.00 |
| Net total | £1,000.00 |
| VAT @ 20% | £200.00 |
| Contract Sum | £1,200.00 |
- Any further defective timber found beyond the two joist ends identified
- These works are instructed before second fix begins, so no completed work has to be taken up again
| Payment | When it becomes due | Amount (inc. VAT) |
|---|---|---|
| Payment in full on completion | £1,200.00 | |
| Account name | Norman & Co. Builders |
| Sort code | 00-00-00 |
| Account number | 00000000 |
- If you accept this quotation within 30 days of the date of issue, the price is fixed. After that it lapses, and we will re-quote before any new price applies.
- The price covers only the works and materials described above. Any additional or changed work will be quoted and agreed with you as a variation before it is carried out.
- Where shown, VAT has been applied in line with current HMRC rules.
- Payment is due by the dates set out in the Payment Terms above; the deposit secures your booking and start date. If you cancel within your 14 days we return your deposit in full — unless you asked us to start early, in which case we keep a share for the work already done, in proportion to the price of the whole job, and return the rest.
- Work will be carried out with reasonable care and skill, meeting your rights under the Consumer Rights Act 2015. Materials we supply will be of satisfactory quality, fit for purpose and as described.
- If we uncover something that could not reasonably have been seen when we quoted, such as rot, a hidden leak or unsafe wiring, we stop, tell you what we have found, and price the extra work for your approval before going on. If you do not agree the extra work, we make the area safe, agree with you how the job is finished or ended, and charge only for work already done and agreed.
- We do not disturb material we suspect contains asbestos. If we find any we stop, tell you, and price any testing or removal for your agreement first.
- Planning permission, listed building consent, party wall agreements and freeholder approval are not included. If any are needed we will tell you and agree who arranges them before work starts.
- Please give us safe access to the working areas for the agreed hours, along with water, power and somewhere reasonable to store materials.
- If severe weather, a supplier failure we could not reasonably avoid, utility works or serious illness delays the works, we tell you promptly, do what we reasonably can to limit the delay, and agree new dates with you. If the delay runs more than 14 days past the agreed date, you may cancel the work not yet done and we refund what you have paid for it.
- When the works are finished we walk round the job with you and agree a written list of anything that needs putting right. That walk-round is Practical Completion: the works are treated as complete from that date, and any defects period runs from it. Agreeing the list does not mean you accept the work as free of faults: your legal rights stay in place for anything found later.
- You have 14 days from the day you accept this quotation to cancel, without giving a reason. To cancel, tell us before those 14 days are up. Any clear statement is enough: a phone call, an email, or a letter to the address on this quotation.
- If you ask us in writing to start work inside those 14 days and then cancel, you pay for the work done up to that point, in proportion to the price of the whole job.
- The 14 days do not apply to a new build, or to urgent repairs or maintenance you asked us to come out for. If on that visit we agree further work, or supply goods beyond the parts the repair needs, you can still cancel that part. Where you asked us to start early, the right to cancel ends once the work is finished.
If you change your mind you have 14 days to cancel, as set out in the terms above. You can use the form below, but you do not have to — any clear statement that you wish to cancel is enough.
Model cancellation form
(Complete and return this form only if you wish to withdraw from the contract)
To Norman & Co. Builders, Unit 4, Fenwold Trade Park, Kestlebury BH15 1CX, office@normancobuilders.example:
I/We [*] hereby give notice that I/We [*] cancel my/our [*] contract of sale of the following goods [*]/for the supply of the following service [*],
Ordered on [*]/received on [*],
Name of consumer(s),
Address of consumer(s),
Signature of consumer(s) (only if this form is notified on paper),
Date
[*] Delete as appropriate
You have 14 days to cancel, as set out in the terms. You do not have to give that up — but if you would like us to begin before those 14 days are over, please tick and sign here.
☐ I want work to start before my 14-day cancellation period is over. If I cancel once it has begun, I will pay for the work already done. Once the job is finished, I can no longer cancel.
These additional works may be accepted by any of the following, whichever happens first:
- Accepting online using the secure link we send, quoting ref TD-2094-V1;
- Confirming acceptance in writing by email to office@normancobuilders.example;
- Signing and returning a copy of this document.
The whole sheet, scaled to fit your screen. Tap it to read it full size.
Final account · what the job actually came to
A quotation is a promise about a job that has not happened yet. This is the same bathroom at the other end of the works: the original quotation, every change that was agreed along the way, and one figure at the bottom. Each line carries the reference and the date it was agreed, so it can be checked against the customer’s own pile of signed sheets.

- Address
- 12 Saltery Row, Wendlemouth, BH18 8CB
- Address
- Unit 4, Fenwold Trade Park, Kestlebury BH15 1CX
- Phone
- 01632 960 118
- office@normancobuilders.example
- VAT no.
- GB 274 1592 08
| Document | Amount | |
|---|---|---|
| Original quotationTD-2094Full strip-out and refitAgreed 22 Jun 2026 | £8,640.00 | |
| 1 | Additional worksTD-2094-V1Additional works to the floor structureAgreed 2 Jul 2026 | £1,200.00 |
| Final account total | £9,840.00 |
This is a summary of the works agreed on this job — the original quotation and every variation signed since — and the sums agreed for each. The amounts are those already agreed on the documents listed; nothing has been re-priced here. This is not an invoice and not a request for payment. Invoices are issued separately, and some of this may already have been paid.
The whole sheet, scaled to fit your screen. Tap it to read it full size.
Invoice · the bill for the same job
A quote is a promise; an invoice is the demand that follows it, and the two have to agree. This is the last one on the job. It lists the quotation, the agreed extra and the credit, takes off the deposit and the first-fix payment already made, and bills what is left, with bank details and a reference so the payment can be matched to the job. It is the same renderer the customer sees when they open the link in their text message.

- Address
- 12 Saltery Row, Wendlemouth, BH18 8CB
- Address
- Unit 4, Fenwold Trade Park, Kestlebury BH15 1CX
- Phone
- 01632 960 118
- office@normancobuilders.example
- VAT no.
- GB 274 1592 08
| What this invoice covers |
|---|
| 1.Bathroom renovation — full strip-out and refit (quotation TD-2094) |
| 2.Additional works to the floor structure (variation TD-2094-V1) |
| Final balance, now due | £4,656.00 |
| includes VAT at 20% | £776.00 |
Of the £9,840.00 agreed for this job: a £2,160.00 deposit was already paid, £3,024.00 was invoiced before this one, this invoice is £4,656.00, and nothing remains — it is the final payment on the job.
Payment due by 21 July 2026. Please pay £4,656.00 to Norman & Co. Builders. Any queries, contact office@normancobuilders.example.
| Account name | Norman & Co. Builders |
| Sort code | 00-00-00 |
| Account number | 00000000 |
- Payment is due within 7 days of the date of this invoice.
- Work has been carried out with reasonable care and skill.
The whole invoice, scaled to fit your screen. Tap it to read it full size.
What your customer sees
You send a link. They open it on their phone — no app, no login — read the quote with your name and logo on it, and accept and sign with a tap. The signature comes back to you, recorded with the date and time.

- Address
- 12 Saltery Row, Wendlemouth, BH18 8CB
- Address
- Unit 4, Fenwold Trade Park, Kestlebury BH15 1CX
- Phone
- 01632 960 118
- office@normancobuilders.example
- VAT no.
- GB 274 1592 08
| Schedule of Works | Amount |
|---|---|
| 1.Strip out existing suite, protect the landing and stairs, remove and tip all waste | £850.00 |
| 2.First fix plumbing and electrics: reroute supplies, new spur, extractor and lighting | £1,300.00 |
| 3.Board and tank the wet areas, make good ceiling and window reveals | £1,100.00 |
| 4.Wall tiling and vinyl flooring, labour and adhesives | £1,700.00 |
| 5.Supply and fit sanitaryware, shower valve and glass screen | £1,500.00 |
| 6.Second fix, decoration, seal, snagging and final clean | £750.00 |
| Net total | £7,200.00 |
| VAT @ 20% | £1,440.00 |
| Contract Sum | £8,640.00 |
| Payment | When it becomes due | Amount (inc. VAT) |
|---|---|---|
| Deposit — 25% | On acceptance | £2,160.00 |
| Stage payment 1 | On first fix | £3,024.00 |
| Final balance | On completion | £3,456.00 |
| Account name | Norman & Co. Builders |
| Sort code | 00-00-00 |
| Account number | 00000000 |
- If you accept this quotation within 30 days of the date of issue, the price is fixed. After that it lapses, and we will re-quote before any new price applies.
- The price covers only the works and materials described above. Any additional or changed work will be quoted and agreed with you as a variation before it is carried out.
- Where shown, VAT has been applied in line with current HMRC rules.
- Payment is due by the dates set out in the Payment Terms above; the deposit secures your booking and start date. If you cancel within your 14 days we return your deposit in full — unless you asked us to start early, in which case we keep a share for the work already done, in proportion to the price of the whole job, and return the rest.
- Work will be carried out with reasonable care and skill, meeting your rights under the Consumer Rights Act 2015. Materials we supply will be of satisfactory quality, fit for purpose and as described.
- If we uncover something that could not reasonably have been seen when we quoted, such as rot, a hidden leak or unsafe wiring, we stop, tell you what we have found, and price the extra work for your approval before going on. If you do not agree the extra work, we make the area safe, agree with you how the job is finished or ended, and charge only for work already done and agreed.
- We do not disturb material we suspect contains asbestos. If we find any we stop, tell you, and price any testing or removal for your agreement first.
- Planning permission, listed building consent, party wall agreements and freeholder approval are not included. If any are needed we will tell you and agree who arranges them before work starts.
- Please give us safe access to the working areas for the agreed hours, along with water, power and somewhere reasonable to store materials.
- If severe weather, a supplier failure we could not reasonably avoid, utility works or serious illness delays the works, we tell you promptly, do what we reasonably can to limit the delay, and agree new dates with you. If the delay runs more than 14 days past the agreed date, you may cancel the work not yet done and we refund what you have paid for it.
- When the works are finished we walk round the job with you and agree a written list of anything that needs putting right. That walk-round is Practical Completion: the works are treated as complete from that date, and any defects period runs from it. Agreeing the list does not mean you accept the work as free of faults: your legal rights stay in place for anything found later.
- You have 14 days from the day you accept this quotation to cancel, without giving a reason. To cancel, tell us before those 14 days are up. Any clear statement is enough: a phone call, an email, or a letter to the address on this quotation.
- If you ask us in writing to start work inside those 14 days and then cancel, you pay for the work done up to that point, in proportion to the price of the whole job.
- The 14 days do not apply to a new build, or to urgent repairs or maintenance you asked us to come out for. If on that visit we agree further work, or supply goods beyond the parts the repair needs, you can still cancel that part. Where you asked us to start early, the right to cancel ends once the work is finished.
If you change your mind you have 14 days to cancel, as set out in the terms above. You can use the form below, but you do not have to — any clear statement that you wish to cancel is enough.
Model cancellation form
(Complete and return this form only if you wish to withdraw from the contract)
To Norman & Co. Builders, Unit 4, Fenwold Trade Park, Kestlebury BH15 1CX, office@normancobuilders.example:
I/We [*] hereby give notice that I/We [*] cancel my/our [*] contract of sale of the following goods [*]/for the supply of the following service [*],
Ordered on [*]/received on [*],
Name of consumer(s),
Address of consumer(s),
Signature of consumer(s) (only if this form is notified on paper),
Date
[*] Delete as appropriate
You have 14 days to cancel, as set out in the terms. You do not have to give that up — but if you would like us to begin before those 14 days are over, please tick and sign here.
☐ I want work to start before my 14-day cancellation period is over. If I cancel once it has begun, I will pay for the work already done. Once the job is finished, I can no longer cancel.
This quotation may be accepted by any of the following, whichever happens first:
- Accepting online using the secure link we send, quoting ref TD-2094;
- Paying the deposit or any amount shown towards the works;
- Confirming acceptance in writing by email to office@normancobuilders.example;
- Signing and returning a copy of this quotation.
Scroll inside the phone to read it as your customer does.
Free rebuild · no account · one reply
Send us a quote, and we’ll rebuild it.
Email your last quote to hello@tradedraft.co.uk and we'll rebuild it free: your own job, your figures, back with you within a few days.