Fifty prices held.
The first fifty UK trades on TradeDraft get a direct line to the person building it and a real say in what gets built next — and your price is held at £22.50 a month for 12 months. Everyone after pays £45.
Your number comes by email when you claim
- Standard price
- £45/month
- Your price
- £22.50/month
Valid untilTwelve months from the start of your subscription.
The fifty close on 31 December 2026, or when they’re gone — whichever comes first.
No card to reserve. · 30-day free trial when you start. · Cancel any time.
Want the £22.50 held? Claim your place first. Your code goes in at checkout — the billing portal has no box for it.
The quote your client gets.
- A proper costed quotePriced line by line from your own rates, on your letterhead, sent from the van or the kitchen table.
- VAT, CIS and the Reverse Charge handledAnswer a couple of plain questions and the right treatment lands on the quote, without you looking anything up.
- Warned before a job loses you moneyA thin price is flagged while you can still fix it, and clients accept online — paying a deposit by card too, on domestic jobs.
A price held, in return for the truth.
I'd rather build TradeDraft around fifty trades who tell me what's wrong than launch quietly and hope it's right.
What you get
- £22.50 a month, held for 12 monthsThe public price is £45. Yours stays at £22.50 for your first 12 months.
- A direct line to meNot a ticket queue. A real way to reach the person building it when something's wrong or you need something added.
- A genuine say on what gets builtWhat the fifty tell me sets the order of the roadmap. Ask for something and it goes on the list.
- The full TradeDraft plan, nothing kept backBranded quotes, VAT, CIS and the Reverse Charge, the profit check, online acceptance, card deposits. All of it — the subscription is what covers sending and downloading.
Why I'm doing this
I spent years in the UK building trade watching good trades lose money on jobs that should have paid. A price guessed in the van. VAT and CIS worked out wrong. No real margin left at the end.
TradeDraft is the tool I wished those trades had, and I don't want to launch it on a stranger's say-so. I want fifty real trades putting it through real jobs, telling me where it's clumsy so I can sharpen it. In return, you pay less than anyone who comes after you.
You give a customer a price and you stand by it, however long the job runs. That is the whole habit this thing is built to protect, so it would be a poor start to treat my own price any differently. Fifty prices, held.
TradeDraft
Three steps to a held price.
Claiming a place takes thirty seconds. You only pay once you've tried it on a real job and decided it earns its keep.
Claim your place
Four boxes, thirty seconds. Your place is held while you try it — no card, nothing to commit to yet.
Try it on a real job
Build a full costed quote for free, with no account. Sending or downloading starts your 30-day trial, and that is where your code goes in.
£22.50, held for a year
Nothing is charged during the trial. When it ends, add a card to continue at £22.50, held there for your first 12 months. Do nothing and it simply stops — we hold no card, so there is no surprise charge either way.
Once the fifty are held, it's £45 for everyone.
No card, no commitment, and nothing charged until you decide to start.
Questions, answered straight.
Why only fifty?
Because I can actually listen to fifty. I want to read every message, fix what's clumsy, and build the next piece around what real trades tell me. Open it to everyone and the feedback turns into a queue I can't keep up with. Fifty is small enough that your voice genuinely counts.
How long is the £22.50 held for?
Twelve months from the start of your subscription. If the public price rises in that time, yours does not. After 12 months it moves to the standard price then in force, and cancelling means you rejoin at the price in force then. It covers the TradeDraft subscription as it stands, with every feature included and every improvement to it as it's built; if I ever sell something genuinely separate, that would be its own thing. There is nothing else buried in the small print.
What happens when all fifty are taken?
It closes. After that the plan is £45 a month or £450 a year, with the same features, the same free trial and the same terms.
The held price is limited to the first 50 UK-based trade businesses to claim a place, one place per business. The £22.50/month price (or £225/year) is held for the first 12 months of your subscription, in place of the standard £45/month (£450/year). After 12 months the standard price then in force applies. It applies to the TradeDraft subscription and every improvement made to it; anything sold separately in future is priced on its own terms. If you cancel, the held price ends; any future re-subscription is at the public price in force at that time. We are not currently VAT-registered, so no VAT is added to that price; prices are exclusive of any VAT that becomes chargeable, and we will tell you before any such change affects your bill. Billing is handled securely by Stripe and your data is stored in the UK. Cancel any time; monthly has no minimum term. Testimonials are only ever used with your permission. Once 50 places are taken, the offer closes and will not be reopened.