TradeDraft — build a professional, compliant quote

TRADEdraft
Home Pricing
Your account
Sign in Rate Book Account Your business Sign Out

The job

Who's the job for? Choose your trade once — editable anytime in Your business.

Client pays Your profit

Your Trade

Pick the closest match — you only set this once, and can change it anytime in Your business. It loads starting figures you can adjust on any quote.

Client

Just the name is required — add whatever else you've got (it all prints on the quote).

Job details

Pick a type — it becomes the title on your quote, with your description underneath.

Printed on page one, above the schedule.0 / 240

For when you bill one address and work at another — a landlord, a letting agent, or a main contractor's office. Leave it off if they're the same.

New work, or a change to an agreed job?

VAT & reverse charge

A couple of plain questions about the job — we set the right VAT (and the reverse charge) for you. No tax codes to pick.

Profit, % on your costs
%
Why isn't markup the same as margin?

This is your profit only, worked out on what the job costs you. Your running costs are added separately, so the final price is more than your costs plus this %.

Schedule of Works

Enter what each line costs you, not what you'd charge. Your profit and running costs are added on top.

Your Pricing

How long will it take?
day

Half-days allowed. Running costs £55 a day.

What are running costs?

What it costs to keep you working whether or not you're on a job: van, fuel, insurance, phone, tools, accountant. Spread over a working year they come to a daily figure, and every quote picks up its share for the days the job takes. The longer a job takes, the more running costs it has to cover — the bit most trades forget, and why they end up working for nothing.

—
More options

For supply-only work, or a day-rate sub-contract that already covers your van, fuel and insurance. Leave it unticked for normal jobs, or this quote pays no share of your running costs.

Every line still prints, in words, with one total instead of a price against each. Scope, exclusions, payment stages and terms are unchanged, and you still see every figure yourself.

Payment terms

How will your client pay? It prints on the quote.

Payment in full — one payment when the job's done.Deposit & stages — an upfront deposit (plus any stage payments), with the balance at the end.

One last look
Client pays £0.00 inc. VAT
Net, VAT and CISworked out from the client type
Net contract value£0.00
VAT @ 20%£0.00
Contract Sum£0.00
Client pays£0.00

VAT, CIS and reverse charge are worked out from the client type — sense-check them. TradeDraft isn't tax advice; the figures you send stay your responsibility.

VAT & reverse charge

Terms & conditionsTradeDraft standard · included on this quote Change

Your usual choice is remembered for every new quote. Edit the wording in Your business →

TradeDraft standard terms are written for work carried out. Supplying goods only, with no fitting? Choose My own terms and use your terms of sale.

The toggle above picks which terms. Untick to send this one quote with no terms attached.

Exclusions, assumptions, drawings & notesNothing added — listing what's not included protects you from scope creep later Add
Included (optional)
Not included (optional)
This price assumes (optional)
Drawings (optional)

Up to two, such as a plan and an elevation. They print overleaf on the quote and on the copy your customer accepts. A photo or screenshot of the drawing works; save a PDF drawing as an image first.

Each row becomes its own numbered clause on the quote under What's not included. Listing what isn't covered protects you from scope creep; writing down what you're assuming is what makes it a variation, rather than your problem, when one turns out not to be true.

Prints on the quote under Notes. (Your device spell-checks these boxes as you type.)

Advanced optionsretention, defects liability & quote dates — most jobs don't need these Change

Your workmanship guarantee — prints on the quote. Set to 0 for no warranty.

Defaults to today. The valid-until date is counted from here.

A % held back until the works are complete — usual on subcontract or commercial jobs, uncommon for domestic. Leave off unless you're holding retention.

Send your quote

Your client opens it on their phone (no app, no login) and accepts with a tap. You can check any time whether they've opened it; your costs and margin stay hidden.

Or send it yourself

This sends a summary as a message, not the quote itself. The Send button above gives them the whole document on their phone, with nothing to download and no login.

Keep a copy